Create an area-by-area record of body, interior, electrical, mechanical and trim condition. Note what was inspected, what was inaccessible and what is based on the previous owner's account. A missing observation should remain unknown.
Use consistent names and dated updates. If a condition affects safe operation or structural integrity, arrange an appropriate professional assessment before treating cosmetic work as the next step.
Bring your own case
Use these questions to start a thread about the actual configuration, evidence and outcome.
- What has actually been inspected?
- Which areas remain inaccessible?
- Which findings change the project priorities?